Published 30 October 2026 (UTC). Manufacturer sources checked on 30 October 2026.
For a component RFQ, specify the delivery carrier alongside the full manufacturer ordering code and quantity. Record whether the assembly team accepts a full reel, cut tape, a custom reel, tubes or trays. Confirm the offered arrangement before approving the order, including any minimum quantity, order multiple, reeling charge and feeder requirements.
Keep three fields in the enquiry: quantity needed for the build, quantity offered per carrier, and permitted ordering increments. They answer different questions. A quantity that covers the build may still require a different commercial or packing arrangement.
Analog Devices’ ordering FAQ defines minimum order quantity (MOQ) per line item and describes an order multiple as the increment required above that minimum. Its eShop minimum depends on the part and stock; cut-tape availability can permit a smaller purchase. These are ADI ordering terms. Obtain the applicable terms for the actual supplier quotation.
| Carrier requested | Detail to confirm |
|---|---|
| Full reel | Exact ordering code, units per reel and number of reels offered. |
| Cut tape | Number and length of strips; whether separate pieces are acceptable. |
| Custom reel | Who performs the reeling, continuous quantity, leader/trailer arrangement and charge. |
| Tube or tray | Actual carrier supplied and how the remaining quantity is packed. |
TI’s carrier-packaging FAQ says its cut-tape orders may use multiple strips or boxes. TI describes its custom reel as one continuous tape length from a single reel, with leader and trailer for automated feeding, and a reeling fee. Eligibility must be checked for the device. A different seller’s custom-reel offer needs its own written specification.
Ask the assembly team to review the carrier details before accepting a packing change. ADI’s tape-and-reel packaging document identifies tape width, pitch, reel dimensions and pin-1 orientation. Compare the applicable manufacturer drawing with the feeder setup, including any splice or leader requirements. Agree how unusable pockets or setup consumption will be covered rather than assigning a universal extra quantity.
For example, an enquiry can say: “Please quote the listed full ordering code for 600 usable units. Prefer one continuous reel; advise the available carrier, quantity per carrier, minimum/order multiple and reeling charge before confirmation.” This is an RFQ example, not a statement of available stock or packing service.
TI explicitly allows multiple cut-tape strips or boxes. State a continuity requirement and obtain confirmation for the particular offer before sending it to assembly.
A carrier description alone is insufficient evidence of component origin or the offered lot. Review the source, labels and available traceability records separately; the article makes no authenticity determination.
Use the BOM quotation guide to keep these fields together and retain the full code described in the ordering-suffix guide. Include the packing requirements when you prepare a component enquiry. Availability and the final supply arrangement require confirmation.
Sources checked on 30 October 2026: TI carrier-packaging options; ADI ordering FAQs; ADI tape-and-reel packaging. Manufacturer policies describe their own supply channels; the RFQ checklist is purchasing guidance.